The work, carried out through coordination with the Federal Government via the Universal Electrical Service Fund (FSUE), includes the installation of 20 poles, three transformers, and six retaining walls. With this infrastructure, residents of the ranches will be able to use water pumps and improve their living conditions.
Municipal president, Ing. Julio Cardenas, acknowledged the support of Ing. Hector Sanchez Lopez to make this delivery possible, highlighting the joint effort to bring basic services closer to the communities.




