The work included the installation of 200 linear metres of pavement, as well as 568 square metres of hydraulic concrete. Additionally, 380 linear metres of curbs were installed and 408 square metres of zampeado with local stone were completed, along with painting and complementary works to optimise traffic conditions.
With this intervention, the municipal government seeks to provide greater safety and connectivity to the families of the community, improving their living conditions and facilitating access to the locality.




